A Galilee Properties development
Planned Mixed Use

The Nest of Chipinge

A phased mixed-use development planned for Chipinge, with residential stands and supporting commercial, industrial, institutional and community uses.

Location
The Nest of Chipinge
Planned phases
6
Planned units
2,402
Development overview

A considered place to live, invest and grow.

Galilee Properties is desirous of transforming a farm known as The Nest of Kenilworth into a phased mixed-use development by the name The Nest Chipinge, comprising high- medium- and low-density residential stands with supporting commercial, industrial, institutional and community uses. The Nest of Chipinge is planned across six phases. Published inventory and progress are shown only after administrative review and remain subject to confirmation.

2,402Residential stands plannedApproximate planned inventory; not current availability
6Development phases plannedConfigurable phased structure
Delivery plan

Explore the development phases

5 published phases
01Planned

Phase 1

Detailed scope and release information will be published after approval.

10% approved project-reported progress Explore Phase 1
02Planned

Phase 2

Detailed scope and release information will be published after approval.

Explore Phase 2
03Planned

Phase 3

Detailed scope and release information will be published after approval.

Explore Phase 3
04Planned

Phase 4

Detailed scope and release information will be published after approval.

Explore Phase 4
05Planned

Phase 5

Detailed scope and release information will be published after approval.

Explore Phase 5
Current opportunities

Find a stand that fits your plans.

Browse published opportunities and confirm current status with our sales team.

Explore available stands
CommercialAvailable
High Density ResidentialAvailable
InstitutionalAvailable
Project films

Watch the story take shape.

1 public film
Infrastructure

Plans, dependencies and verified status

Approved status information
Planned

Site access

The plan describes access from an existing state road through a proposed 18-metre road, with a second planned 25-metre access between Homefields and Chipinge Township Reserves.

Planned

Water supply

The short-term concept uses 12 existing boreholes and an existing reservoir. Borehole capacity testing is still required to confirm yield and final requirements.

Planned

Sewer treatment

The plan sets aside 1.6388 hectares for sewer treatment ponds and requires the treatment system to be designed in accordance with applicable EMA standards.

Planned

Electricity

The planned supply depends on the capacity of the existing Chipinge electricity network.

Planned

Roads and storm-water drainage

Road and storm-water works are planned in line with the development permit, including surfaced roads.

Planned

High-density residential

Planned

Medium-density residential

Planned

Low-density residential

Planned

Cluster housing

Planned

Garden flats

Planned

Commercial uses

Planned

Industrial uses

Planned

Institutional uses

Planned

Agro-plots

Verified progress

Published reporting timeline

View all updates

Phase One

Road Construction currently underway

10% reported progress
Resources

Documents and planning references

Approved public resources
Site Plan

Approved Survey Diagram DG 7691

Version Approved 2025 · 7,509 KB

Download
Site Plan

Approved Survey Diagram DG 7693

Version Approved 2025 · 6,888 KB

Download
Site Plan

Approved Survey Diagram DG 7694

Version Approved 2025 · 6,706 KB

Download
Site Plan

Approved Survey Diagram DG 7692

Version 1.0 · 7,219 KB

Download
Take the next step

Discuss this development with our team.

Ask about current availability, documentation or arrange a guided site visit.